Back to projects
Monviso hydraulic infrastructure
Start2020February
Completion2021October
water12Kcubic metres
Design of a hydraulic infrastructure at the foot of Monviso for collecting and managing water.
The project combines the hydraulic works with making the surrounding slopes safe.
The project
The work included rock face surveys, geological checks and the sizing of the water collection and conveyance works.
Want more information about this project?
Get in touch!
A ski area to develop, a slope to make safe, a survey to carry out: tell us about your project. Our technical team will reply directly.


