Skip to main content
Work with us Italiano
Write to us
Italiano
Technicians in hard hats examining a rock face

Projects

Monviso hydraulic infrastructure

Back to projects

Monviso hydraulic infrastructure

Civil engineering - Environmental feasibility study
Piedmont - February 2020 / October 2021

Start2020February
Completion2021October
water12Kcubic metres

Design of a hydraulic infrastructure at the foot of Monviso for collecting and managing water.

The project combines the hydraulic works with making the surrounding slopes safe.

The project

The work included rock face surveys, geological checks and the sizing of the water collection and conveyance works.

Want more information about this project?

Get in touch!

A ski area to develop, a slope to make safe, a survey to carry out: tell us about your project. Our technical team will reply directly.

Privacy*
Map of the Alps showing project locations