Back to projects
Gran Sasso dam
Start2022February
Completion2024October
concrete140Kcubic metres
Environmental feasibility study for a dam in the Gran Sasso massif, with special attention to how it fits into the landscape.
The study assesses the effects of the structure on the environment and the area, and identifies the most sustainable design solutions.
The project
The geological, hydraulic and landscape aspects of the area were analysed, comparing several design options to choose the one with the lowest impact.
Want more information about this project?
Get in touch!
A ski area to develop, a slope to make safe, a survey to carry out: tell us about your project. Our technical team will reply directly.


